Rick's Blog

Allen and Chu delay cap tests


From a press conference yesterday – Admiral Thad Allen, National Incident Commander:

“Today I met with Secretary Chu, Marcia McNutt and other scientists and geologists as well as officials from BP and other industry representatives as we continue to prepare and review protocols for the well integrity test – including the seismic mapping run that was made around the well site this morning. As a result of these discussions, we decided that the process may benefit from additional analysis that will be performed tonight and tomorrow.

Both the Helix Producer and the Q4000 collection systems are currently on line with the potential to exceed the containment capability that existed before the sealing cap was installed, and skimmers continue to be surged to the well site in anticipation of any increased oil flow as part of the transition. The drilling of relief wells also continues- the first relief has been drilled to a depth of 17,840 feet below the Gulf surface, and the second to a depth of approximately 15,963 feet below the surface.”

Exit mobile version